SUS304 Stainless Steel Long Floor Drain in shiny/polish

FOB Price: Get Latest Price
Model:PD-3395
Certification:GMC ISO9001:2008
Capable:GMC ISO9001:2008
Minimum Order:50-100PCS
Brief Description:SUS304 Stainless Steel Long Floor Drain in shiny/polish•Marterial: AISI304 Stainless Steel •Surface finished: Polish finished

Joanna zou

  • Product Details

Basic Specification

stainless steeldrainer
surface proceedingpolish
FuntionDrain
ConnectionClamp
TypePlummeting Type
Surface TreatmentPolished
MaterialStainless steel

Detail Description


SUS304 Stainless Steel Long Floor Drain in shiny/polish

Marterial: AISI304 Stainless Steel

Surface finished: Pollish finished

Packing: individual box and outer carton

Can be customized (the lenght from 300/600/800mm)

Item No.DescripationPCS/CTNPacking Size(mm)G.W(KG)
PD-3395Long floor Drain




 Long Floor Drain  lead time: (depend on the QTY)

①、Peak  Season (Nov. to May.): 30-40 days

②、Slack Season (Jue. to Oct.): 25-30 day


 Long Floor Drain  Payment terms: 30% deposit in advance , balance against B/L copy

 Long Floor Drain  MOQ :  7500USD each shipment, can be mixed other product we made.


  Long Floor Drain  Installed Details:

 Making a mark of mounting holes on the wall and drilling 4-6mm;

 Closing the upper cover and locking tightly;

Relected product:

 And Our product range  includes towel rack, handrail, soap dispenser, clothesline, paper holder,

  paper  dispenser, drainer, bathroom accessories etc.

 Long Floor Drain  Quality Control:

We promise to use the AISI304 Stainless Steel.

Strict quality checks.       Many honor in China   : 

A supplier of 2008 Olympic Games: Athletes Village, Water Cube and National Stadium

Selected by 5-star hotels and airports in China.

                                                                                      .

Finish Technique of Stainless Steel  Product:

Technical specification: the surface of workpiece must be bright enough without  any granulated and any pit.             

Polish Finish Treatment:5 polishing working procedure 

①、Coarse emery cloth polishing

②、Delicate emery cloth polishing

③、Sisal flax polishing

④、Hopsacking polishing

⑤、Delicate cotton fabric polishing                                        

Satin Finish Treatment:6 polishing working procedure

①、Coarse emery cloth polishing

②、Delicate emery cloth polishing

③、Sisal flax polishing

④、Hopsacking polishing

⑤、Delicate cotton fabric polishing

⑥、Nylon wheel polishing

Note: the ordinary satin finish treatment reduces 4th and 5th working procedure.

Research and Development

New products launch every year.

Customer-made for you.

Mill Test Certificate:

Packing Detail:

       

       

Many honor in China: 

A supplier of 2008 Olympic Games: Athletes Village, Water Cube and National Stadium

Selected by 5-star hotels and airports in China. 

Top 10 brands in bathroom accessories.

Certification 

We are one of China reputable manufacturers specializing in SUS304 stainless  steel toilets and 

bath-related components and products. 

We have obtained the  ISO9001:2008 quality management system authentication.

ISO 9001-2008

Madrid Agreement for International Registration of Trade Marks 

Factory Shower Room:

 Exhibition & Fair we attanded(Canton Fair, Shang Fair, CBD Exhibition,Brasil Fair...)

Project Reference:

 And we are a supplier of 2008  Olympic Games ,including Athletes Village , Water Cube and 

 National Stadium .And  selected by 5- star hotels and airports in China

Marketing

In the past 20 years, we exported our products to Southeast Asia, North & South America, 

 European Union, Australia and Africa.

We have rich experience to cooperate with global customers. 

Keep smooth communication and follow up the business progress promptly to assure the stable 

 operation &development based on service content and requirement. 

We know you need! 

•Contact us without hesitate: ( www.atgetco.com  )


SUS304 Stainless Steel Long Floor Drain in shiny/polish


Additional Information

Payment TermsL/C, T/T, Western Union, Others
Minimum Order50-100PCS
Lead Time / Delivery Time30 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details30% deposit by TT before production. The other 70% by T/T against the copy of B/L.
FOB PortGuangzhou
Loading InfoWe can deliver the goods to any port of Guangzhou free of charge. Factory located in Guangzhou and convenient to deliver to any port of Guangzhou.
Packing InfoExport carton
Target Market(s)Eastern Europe, Hong Kong/ Macao/ Taiwan, Latin America, Mainland China, Middle East, North America, Northern Europe, Central & Southern Asia, Southeast Asia, Western & Southern Europe

Send your message to this manufacturer


3000
SearchPost Buying Lead